Pole Hoist Davit AFT751080

4. INSTALLATION:

STEP1: Connect the base assembly with Cantilever arm followed by locking pin at base assembly. STEP2: Attached the winchAFT730020,AFT730040,AFT730120,AFT730135 on pre-installedmounting bracket of cantilever arm. STEP3: Real out the wire approx. 5meter fromwinch by rotating the hoist handle. l Winch on Davit (AFT751080):

Cantilever arm

Winch

base assembly

pre-installed mounting bracket

Step 3

Step 1

Step 2

STEP4: Remove locking pin of pulley from cantilever and pass the wire from guided pulley and lock the pin again. Now pass the rope from top of cantilever by rotating the hoist tomatch the slots and lastly pass the rope from inside of U clamp. Refer Step 4.1 to Step 4.4

locking pin of pulley

rotating hoist

Step 4.3 guided pulley

Step 4.2

Step 4.1

Step 4.4

STEP 5 : Now connect the U-clamp over the head at nearest possible anchor point with suitable connector. Refer step 5.1 & Step 5.2.

U Clamp

Step 5.2

Step 5.1

2

Made with FlippingBook Ebook Creator