KStrong IMPACT Lifeline Series UIM

HORIZONTAL ANCHORAGE LINE SYSTEM

Standing Seam Post Assembly

1

2

3

Place cross beam over clips and insert bolt into the beam and seam clip below

Insert bolt through plain washer, anchor and beam.

17 Nm, making certain the cross beam and seam clips are secure. Place the steel washer onto the bolt and tighten bolt to the correct torque setting of

4

5

6

A) Hex Bolts

B) Grub Screws

Place the washer and nyloc nut onto the bolt. Tighten nut and bolt to the correct torque settings of 17 Nm making certain the cross beam and anchor are secure.

Install the post directly over the standing seam and tighten to secure (refer 6 for tightening sequence)

Tightening sequence of Clamp: B) Then tighten Grub Screws to make final adjustment A) Tighten Hex Bolts as far as possible

Now repeat process for the intermedaite and corner posts. 7

23

Made with FlippingBook Online newsletter creator