Honeywell - Miller Product Inspection Guide

4 PASS: o Initial_________ Inspection Checklist – Fall Protection Equipment c ousing er scrip ion: Model #: Retra De table Lanyard (H /Cov Field Removable) t Serial # ate of Manufacture: : D Inspect ate Inspected: or: D Inspect re: or Signatu  FAIL: ___ ❑ Initial______ ✔ Model #: Date of Manufacture: Date Inspected: mild detergent. Towel dry. Store in a clean dry location, free of exposure to fumes, heat, direct ultra violet light, sunlight and corrosive elements. The lifeline should be fully retracted into the unit when not in use. Failure to do so on some models may cause premature weakening of the mainspring resulting in a loss of lifeline retraction. PASS: ❑ Initial_________

INSPECTION CHECKLIST - FALL PROTECTION EQUIPMENT ree of exposure to fumes, heat, direct ultra violet light, ts. acted into the unit when not in use. Failure to do so on mature weakening of the mainspring resulting in a loss of ree of exposure to fumes, heat, direct ultra violet light, ts. acted into the unit when not in use. Failure to do so on mature weakening of the mainspring resulting in a loss of st – Fall Protection Equipment ousing er Model #: H /Cov Field Removable) Date of Manufacture: Date Inspected: 8 FAIL: o Initial_________ REMOVE FROM SERVICE st – Fall Protection Equipment ousing er Model #: H /Cov Field Removable) Date of Manufacture: Date Inspected: RETURN TO SERVICE R E FROM SE Description: Serial #: Inspector: Inspector Signature: EMOV RVICE

RETURN TO SERVICE

PASS: ❑ Initial_________ ✔ RETURN TO SERVICE PASS: ❑ Initial_________ ✔ RETURN TO SERVICE

VICE _ VICE _

___ ___

Product Inspection Guide 800.873.5242  www.millerfallprotection.com

48

Item #

Description

Fail 8

Pass 4

Comments

Load Impact Indicator Webbing Stitching Labeling (tags) Deformation Housing

48 48

lprotection.com llprotection.com

Product Inspection Guide

46

Made with FlippingBook Digital Proposal Maker